top of page

NATURAL GAS

FEEDER LINE 99

$7.3 Million- Completed 2015

This project included the installation of approximately 45,000 feet of 12" and 4,000 ft of 8" high pressure gas transmission line. The project also included installation of a new pressure regulating station. The project required extensive traffic control, rock excavation and working in narrow canyon areas.

MLB68 2017 REPLACEMENT PROJECT

$3.1 Million- Completed in 2017

14" welded steel high-pressure gas line project in Rifle Colorado. The project includes installation of 9,425 ft of piping. Rock excavation, wetland and canal crossing and clearing and restoring of ROW are required.

FEEDER LINE 36 REPLACEMENT PROJECT

$3.9 Million- Completed in 2016

This project includes the construction of approximately 15,000 feet of high pressure gas main with 2,500 feet installed by directional drill. The work also included all pipeline connections, a canal crossing, extensive traffic control and replacement of all hardscape surfacing.

bottom of page